Initialize a new node and add it to the configuration of an existing cluster.
The initialization process consists of creating the cluster namespace in the new node (the database itself must already exist), loading all the base tables, functions, procedures and initializing the node. The existing configuration of the rest of the cluster is copied from the "event node".
The unique, numeric ID number of the new node.
A descriptive text added to the node entry in the table sl-node
Specifies that the new node is a virtual spool node for file archiving of replication log. If true slonik will not attempt to initialize a database with the replication schema.
The ID of the node used to create the configuration event that tells all existing nodes about the new node. Default value is 1.