A setup matrix defines the time and cost of setup conversions on a resource. Within a setup matrix rules are used to define the changeover cost and duration.
To compute the time of a changeover the algorithm will evaluate all rules in sequence (in order of priority). For a rule to match the changeover between theoriginal setup X to a new setup Y, two conditions need to be fulfilled:
The wildcard characters * and ? can be used in the fromsetup and tosetup fields. As soon as a matching rule is found, it is applied and subsequent rules are not evaluated. If no matching rule is found, the changeover is not allowed.
For instance, consider a setup matrix with the following rules:
Priority | From | To | Duration | Cost |
---|---|---|---|---|
1 | *green | *green | 0 | 10 |
2 | *red | *red | 0 | 10 |
3 | *green | *red | 1 day | 50 |
4 | *green | 2 day | 50 | |
5 | 3 day | 50 |
Based on this matrix:
A change from ‘lightgreen’ to ‘darkgreen’ takes no time, but costs 10. Rule 1 applies.
A change from ‘green’ to ‘black’ takes 2 days and costs 50. Rule 4 applies.
Fields
Field | Type | Description |
---|---|---|
name | non-empty string | Unique name of the setup matrix.
This is the key field and a required attribute.
|
rules | list of setup matrix rules | A read-only list of rules in this matrix. |
Within a setup matrix rules are used to define the changeover cost and duration.
The rules are evaluated in sequence, starting with the lowest priority number.
Field | Type | Description |
---|---|---|
priority | integer | The priority of the rule.
This is the key field.
|
fromsetup | string | The previous setup.
If the field is empty the rules applies to any previous
setup value.
Wildcard characters are allowed in this string: * matches a sequence of characters, and ? matches a single character. |
tosetup | string | The new setup.
If the field is empty the rules applies to any new
setup value.
Wildcard characters are allowed in this string, similar
as in the fromsetup field.
|
duration | timeperiod | Duration of the changeover. |
cost | double | Cost of the changeover. |